Is Manufacturing Integration Technology recent solar equipment order cancelled?

June 15, 2015 at 7:43 pm Leave a comment

According to PV magazine, “Hanergy Holdings has announced the termination of a US$175 million order, announced at the start of May, for wholly-owned subsidiary, Fujan Apollo’s silicon-based BIPV production equipment and technical services.

The original deal had envisioned six BIPV module assembly lines, although details on when or where the delivery and manufacturing would take place were absent.

“After arm’s length negotiations, the parties to the Equipment Sales and the Technical Services Agreements agreed to terminate the Equipment Sales and the Technical Services Agreements and had on 14 June 2015 entered into a termination agreement,” wrote Hanergy in a statement released today.”

Read more: http://www.pv-magazine.com/news/details/beitrag/hanergy-cancels-own-900-mw-equipment-order_100019819/#ixzz3d8819FBF

Manufacturing Integration Technology clinched orders for solar equipment for BIPV assembly lines in May 2015 too. Is this order same as the order won by Hanergy Thin film which has now been cancelled?

Entry filed under: Watch your step. Tags: .

Dr Lam Pin Min’s political swansong? Oxley holdings Arcsphere Industrial Building

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Trackback this post  |  Subscribe to the comments via RSS Feed


Recent Posts

June 2015
M T W T F S S
« May   Jul »
1234567
891011121314
15161718192021
22232425262728
2930  

Archives

Blog Stats

  • 37,441 hits

%d bloggers like this: